Most whole-house remodels in Los Angeles start with a kitchen and end up touching the structure. That is not a sales line. Once a 1920s bungalow or a 1950s ranch is open, you see the undersized footings, the knob-and-tube remnants, the bearing wall someone cut in 1987, and the galvanized pipe that is one more year from failing. A good remodel budget expects this.
Begin with the structure, then the systems, then the finishes. Walls that move need engineered beams and headers, sometimes new pads or footings under the posts. Plumbing and electrical should be brought up to current code while the walls are open, because doing it later means opening them again. Only after that do flooring, cabinets, tile, and paint go in.
Permits are not optional for structural, plumbing, or electrical work in the City of Los Angeles, and unpermitted work shows up at resale and in insurance claims. Your contractor should spell out which permits the job needs, who pulls them, and how inspections fit the schedule.
Decide early whether you will live in the house during the work. It is usually possible with proper dust containment, a working bathroom, and a crew that cleans up every day, but it adds time. A clear sequence lets you plan around the loud and dusty weeks instead of being surprised by them.
Finally, insist on a written scope with allowances, a week-by-week schedule, and a change-order process that prices every change before it becomes work. The remodels that finish calm are the ones that were fully planned before the first wall came down.